Next THURSDAY NOVEMBER 25 countdown for obtaining permits of the 2011 Bearded
So that day there will be an important meeting in the City of Sabiñánigo to discuss issues related to ensuring maximum safety and protection medioambienteal during testing, maintaining its prestige and its status of being a reference to international tests of this type.
from France The importance attached to the Vulture can be seen that at the meeting are listed Sabiñánigo the heads of the French zone in Safety, Environment, Infrastructure, Prison, Fire, SAMU Pau Hospital, Parc National Director les Pyrénées, with the Head of Civil Protection Interministerial and the Sous Prefect M. Philippe Jamet heading the delegation.
the English side will have the presence of Mr. Ramón Zapatero (Government Sub in Huesca), Provincial Traffic Chief, Lieutenant Colonel Chief Civil Guard Command, responsible for Fire and Civil Protection, Mr. Mariano Fañanás (Chairman of the Gallego Alto County), Mr. Jesus Lasiter (Mayor of Sabiñánigo) and representatives of the Peña Ciclista Edelweiss.
The goal is to take stock of this year, study and propose solutions to start preparations for the Bearded 2011.
In particular, taking into account the adverse meteorolócas of this year, will work in order to have different preparations specific action plan for emergencies, which must be activated when made with weather forecasts days in advance, so it
advice
The agenda listed as important issues: the Bearded
Balance 2010.
accident occurred and its management
Pyrenees National Park. Environmental proposals. Preparations for the Bearded
2011
safety plans and evacuation ex English.
Action Plans specific to special meteorological situations
possible road closures.
must also set the maximum number of riders allowed, the proposal of the organization is requesting that this number is higher than the previous
0 comments:
Post a Comment